CLSSGB Exam Questions - Online Test


CLSSGB Premium VCE File

Learn More 100% Pass Guarantee - Dumps Verified - Instant Download
150 Lectures, 20 Hours

certleader.com

we provide Precise GAQM CLSSGB free draindumps which are the best for clearing CLSSGB test, and to get certified by GAQM Certified Lean Six Sigma Green Belt (CLSSGB). The CLSSGB Questions & Answers covers all the knowledge points of the real CLSSGB exam. Crack your GAQM CLSSGB Exam with latest dumps, guaranteed!

Free CLSSGB Demo Online For GAQM Certifitcation:

NEW QUESTION 1
Nominal Scale data consists of names, labels or categories and cannot be arranged in any mathematical ordering scheme. Complex arithmetic functions cannot be easily applied to Nominal Data:

  • A. True
  • B. False

Answer: A

NEW QUESTION 2
The Regression Model for an observed value of Y contains the term ?o which represents the Y axis intercept when X = 0.

  • A. True
  • B. False

Answer: A

NEW QUESTION 3
As part of a Visual Factory plan Kanban cards are created and utilized to identify areas in need of cleaning and organization.

  • A. True
  • B. False

Answer: B

NEW QUESTION 4
One of the metrics commonly used in Lean Six Sigma is DPU. This acronym stands for __________.

  • A. Deferred planned usage
  • B. Defects per unit
  • C. Decreased production utilization
  • D. Downtime per unit

Answer: B

NEW QUESTION 5
An employee of ACME Corporation noticed that every loan application that gets approved is copied four times and is stored in different locations in the company for no apparent reason. This would be an example of __________.

  • A. Internal Failure Costs
  • B. Appraisal Costs
  • C. External Failure Costs
  • D. Prevention Costs

Answer: A

NEW QUESTION 6
As a type of measurement error, Linearity describes a change in accuracy through the expected operating range of the measurement instrument.

  • A. True
  • B. False

Answer: A

NEW QUESTION 7
Which statement(s) describe an undesirable situation when implementing SPC?

  • A. The lower Control Limit for the R chart is equal to zero
  • B. Attempt to use SPC for tracking transaction times at a warehouse
  • C. A process is in Statistical Control before implementation of SPC
  • D. The Control Limits are wider than the customer specification limits

Answer: D

NEW QUESTION 8
If the data displayed in a Histogram displays two peaks the distribution would likely be __________.

  • A. Transformed
  • B. Multi-skewed
  • C. Bi-attribute
  • D. Bimodal

Answer: D

NEW QUESTION 9
While management of a company must set the stage for all improvement efforts, which of these 5S’s is primarily driven by management?

  • A. Straighten
  • B. Sort
  • C. Shine
  • D. Sustain

Answer: D

NEW QUESTION 10
Process Capability is a function of which of these?

  • A. Customer requirements
  • B. Process performance
  • C. Output over time
  • D. All of these answers are correct

Answer: D

NEW QUESTION 11
When utilizing Statistics the population is defined as a collection of all the individual data points of interest.

  • A. True
  • B. False

Answer: A

NEW QUESTION 12
When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make certain the activity is __________.

  • A. Well documented
  • B. Removed from the line
  • C. Mistake proofed
  • D. Highly visible

Answer: C

NEW QUESTION 13
Standardized work instructions apply to which resource in the process of interest?

  • A. People
  • B. Machines
  • C. Supervision
  • D. Engineering

Answer: A

NEW QUESTION 14
What is the Cycle Time, in seconds, for a process having a Throughput of 7,200 units per hour?

  • A. 0.5
  • B. 2
  • C. 4
  • D. 10

Answer: A

NEW QUESTION 15
Measurement System Analysis is a procedure used to quantify all __________ in the method or system used for taking measurements.

  • A. Totals
  • B. People involved
  • C. Variation
  • D. Summations

Answer: C

NEW QUESTION 16
Cost of Poor Quality (COPQ) can be classified as Tangible (Visible) Costs and Hidden Costs.

  • A. True
  • B. False

Answer: A

NEW QUESTION 17
The Accuracy of a Measurement System addresses __________.

  • A. Stability, Bias & Linearity
  • B. Repeatability & Reproducibility
  • C. Stability & Sensitivity
  • D. Precision & Sensitivity

Answer: A

NEW QUESTION 18
......

Recommend!! Get the Full CLSSGB dumps in VCE and PDF From Allfreedumps.com, Welcome to Download: https://www.allfreedumps.com/CLSSGB-dumps.html (New 200 Q&As Version)