Want to know Exambible 70-499 Exam practice test features? Want to lear more about Microsoft Recertification for MCSD: Application Lifecycle Management certification experience? Study Practical Microsoft 70-499 answers to Up to the minute 70-499 questions at Exambible. Gat a success with an absolute guarantee to pass Microsoft 70-499 (Recertification for MCSD: Application Lifecycle Management) test on your first attempt.
Q31. - (Topic 1)
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server.
You are configuring a set of automated build servers for TFS that includes one build controller and four build servers, with TFS Build Agents installed on each. All build servers are configured with the same base set of software.
You have a software component that is licensed for a single build server and can be installed on only one build machine.
You need to configure a set of build definitions that rely on this software component to utilize the correct build machine.
What should you do?
A. Add the name of the software component and the name of the build agent it is installed on to the Installed Components list in the build controller properties. In the build definition, add the name of the software component to the Required Components list.
B. Add a tag to the build agent (indicating which machine has the software installed) and reference this tag in the Tags Filter setting for the build definition that uses the software.
C. Add a tag to the build agent (indicating which machine has the software installed) and reference this tag in the Name Filter setting for the build definition that uses the software.
D. Add the name of the software component to the Installed Components list in the build agent properties. In the build definition, add the name of the software component to the
Required Components list.
Answer: B
Q32. - (Topic 1)
You are the administrator for a Microsoft Visual Studio Team Foundation Server (TFS) installation at your company's headquarters.
Some of the company's development work is performed offsite at a location with slow Internet access. You set up a version control proxy at that site to lower the response time for those users.
You need to identify the cache hit ratio of the version control proxy to ensure that it meets a minimum service level.
What should you do?
A. Read the performance counters of a client machine.
B. Start the client development environment with the /log option, do some work, and then read the log.
C. Access the ProxyStatistics web service of the version control proxy machine.
D. Read the contents of the ProxyStatistics.xml on the TFS server.
Answer: C
Explanation: http://msdn.microsoft.com/en-us/library/ms400683(v=vs.100).aspx
Q33. - (Topic 3)
You manage a development team that has been assigned the task of developing a reporting application. The team holds a kickoff meeting with the stakeholders to document user requirements.
You review the draft requirements list that results from this meeting.
You need to indicate which requirements likely will require rework before you can send the requirements list to the development team.
Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)
A. Identify requirements that are independent of other requirements. These requirements likely will need to be integrated with the other requirements.
B. Identify requirements that cannot be tested easily. These requirements likely will need details to make them more testable.
C. Identify requirements that do not have estimates. These requirements likely will need additional details before they can be approved.
D. Identify requirements that depend on other requirements. These requirements likely will need to be split.
E. Identify requirements that provide little business value. These requirements likely will need to be reconsidered.
Answer: C,D,E
Q34. - (Topic 2)
You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution
Framework (MSF) for Agile Software Development process template.
You want to organize your test cases by relating them to the user stories for the application
under test.
You need to use a test suite that creates the Tests link type as you add test cases.
Which type of test suite should you create?
A. Static
B. Query-based
C. Linked
D. Requirements-based
Answer: D
Q35. DRAG DROP - (Topic 1)
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server named Server1. Server1 is use’ by two development teams, Devi and Dev2, each of which has its own team project collection.
You add a second TFS 2012 server named Server2, which also uses an instance of Microsoft SQL Server 2012.
You need to move all of Dev2’s content from Server1 to Server2.
What should you do? (To answer, move the six appropriate actions from the list of actions to the answer area and arrange them in the correct order.)
Answer:
68. - (Topic 1)
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server and Microsoft Lab Management (MLM) 2012.
You want to create a clone of the development test environment in your domain that will support testing patches of your software while continuing to support release testing in the existing environment.
You need to configure the environment to support network isolation.
Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)
A. Add each machine to a workgroup.
B. Install a test agent into each machine.
C. Add a NAT server to the environment.
D. Configure the test agent in each machine.
E. Store the environment in a library.
F. Add a domain controller to the environment.
Answer: A,B,F
Q36. - (Topic 1)
Your client’s network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server installed at its main office. TFS Proxy has been installed at a branch office.
You need to reconfigure the TFS Proxy Server to increase the percentage of disk used by the cache.
What should you do?
A. Use the Team Foundation Server Configuration Tool and adjust the percentage of disk used by TFS Server.
B. Modify the web.confiq file of the Proxy Server service and increase the value of the PercentageBasedPolicy configuration item.
C. Modify the TFS Global Web.confiq file and increase the value of the PercentagebasedPolicy configuration item.
D. Modify the TFS Proxy config file and increase the value of the PercentageBasedPolicy configuration item.
Answer: D
Q37. - (Topic 3)
You are using the Microsoft Solution Framework (MSF) for Capability Maturity Model Integration (CMMI) Process Improvement 6.0 process template.
A stakeholder has requested a change, but the change request has not received the attention that it requires.
You need to escalate the change request.
What should you do?
A.
.
Create an impediment work item.
.
Link the new impediment to the change request.
.
Escalate the impediment to get the change request on track.
B.
.
Create a bug work item.
.
Link the new bug to the change request.
.
Escalate the bug to get the change request on track.
C.
.
Create an issue work item.
.
Link the new issue to the change request.
.
Escalate the issue to get the change request on track.
D.
.
Create another change request work item.
.
Link the new change request to the change request.
.
Escalate the change request to get the change request on track.
Answer: D
Explanation: If a change request does not receive the attention that it requires, escalate the matter by creating an issue work item. Link the new issue to the change request, and escalate the issue to get the change request impact assessment on track.
http://msdn.microsoft.com/en-us/library/ee461569.aspx
Q38. - (Topic 3)
You are a project manager responsible for all phases of a new application development project.
Your project is a customer-facing website that is strategic to the rollout of a new product.
You need to ensure that the project is delivered on time and on budget with a minimal number of defects.
What should you do first?
A. Create test plans and author test cases.
B. Conduct exploratory test sessions.
C. Illustrate requirements with Microsoft PowerPoint storyboarding and link storyboards to work items.
D. Engage stakeholders to provide feedback about pre-release software.
Answer: C
Q39. - (Topic 3)
Your company is developing a new version of an existing application. The current list of feature requests is made up mostly of three years’ worth of bug reports and help desk support call data.
The company has no formal process for requesting input from its customer base.
You need to be able to prioritize the information and develop an accurate, useful list of feature requests.
What are three possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose three.)
A.
.
Use focused customer interviews to review the bug reports and help desk data.
.
Create the requirements documents from the resulting information.
B.
.
Create a single requirements document that includes all the bug reports and help desk call items.
.
Put this document on the backlog of the project.
C.
.
Working from the bug reports and help desk data, create an Excel workbook project matrix that ranks items based on complexity and priority.
.
Determine the project requirements for the next iteration that includes the top ranking items on the matrix.
D.
.
use storyboarding diagrams and work with the stakeholders to filter, map, and expand on the bug reports and help desk call data.
.
Review the diagrams with the stakeholders and create requirements documents based on that review.
E.
.
Hold a series of joint application design (JAD) sessions with representation from support,
development, help desk, and customers. Filter out the bad items from the bug reports and help desk data.
.
Create formal requirements documents based on the results of these sessions.
Answer: B,C,E
Q40. HOTSPOT - (Topic 3)
You are the lead tester for Contoso, Ltd. The company is using Microsoft Visual Studio to develop a new software product.
Management wants to test the product as it is developed. Some components that require testing have dependencies that are not yet built or are otherwise unavailable.
You need to test the components.
In the table below, identify where only a shim or a stub can be used in the situation. Make only one selection in each column.
Answer: