Our pass rate is high to 98.9% and the similarity percentage between our OG0-093 study guide and real exam is 90% based on our seven-year educating experience. Do you want achievements in the The-Open-Group OG0-093 exam in just one try? I am currently studying for the The-Open-Group OG0-093 exam. Latest The-Open-Group OG0-093 Test exam practice questions and answers, Try The-Open-Group OG0-093 Brain Dumps First.
Also have OG0-093 free dumps questions for you:
NEW QUESTION 1
Complete the sentence. The TOGAF Technical Reference Model _______
- A. is an example and should be tailored to the needs of an organization
- B. must be used "as is" for developing comprehensive architecture models
- C. contains several industry specific frameworks
- D. is intended to contain the Enterprise Continuum
- E. contains only solution building blocks
Answer: A
NEW QUESTION 2
Complete the sentence. In a gap analysis, a building block that appears in the Target Architecture but does not appear in the Baseline Architecture indicates ______
- A. nonconformant solution building blocks
- B. an error has occurred and the architecture must be re-evaluated
- C. requirements have not been properly documented
- D. functionality that should be eliminated
- E. a new function that must be built or procured
Answer: E
NEW QUESTION 3
Which of the following is described by the TOGAF Architecture Content Framework as a type of artifact that shows relationships between things?
- A. Building Block
- B. Catalog
- C. Diagram
- D. Matrix
- E. Deliverable
Answer: D
NEW QUESTION 4
Which model within TOGAF is intended to assist with the release management of the TOGAF specification?
- A. The Capability Maturity Model
- B. The Document Categorization Model
- C. The Integrated Infrastructure Information Model
- D. The Organizational Model for Enterprise Architecture
- E. The Technical Reference Model
Answer: B
NEW QUESTION 5
Scenario:
Please read this scenario prior to answering the question
Your role is that of a consultant to the Lead Enterprise Architect in a company that speicializes in luxury electric cars and their powertrain components, and also produces battery-charging equipment. It has its own distribution network, its own showrooms, and sells directly to customers via the internet. The company has four manufacturing facilities, two in the North America, one in Europe, and one in Asia.
A challenge that the company is facing to scale up the number of vehicles coming off the production line to meed customer demand, while maintaining quality. At the moment there are supply chain storages for key
electronic components related to the autonomous drive system. In response the this, the research arm of the company has pioneered the development of a new self-driving platform. This new design uses common
off-the-shelf components that will allow for a significant increase in overall vehicle production. This new design is ready to go into production.
The company has a mature Enterprise Architecture practice that is supported by a cross-functional Architecture Board. The TOGAF standard is used for developing the automated manufacturing process and systems used to design, manufacture and test the new design. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
As part of putting the new self-driving platform into production, adjustments to the automated assembly processes need to be made. A pilot architecture project at a single location has defined an updated approach for controlling the automated test systems used to perform final quality assurance. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for immediate implementation at each plant.
Architecture Contracts have been developed that detail the work needed to implement and deploy the new automated test system controller for each location. The Chief Engineer has expressed concern that a uniform process be employed at each location to ensure consistency and quality.
Refer to the Scenario
The Lead Enterprise Architect has asked you to recommend the best approach to address the Chief Engineer’s concern.
Based on the TOGAF standard, which of the following is the best answer?
- A. You create an Architecture Contract to manage and govern the implementation and migration proces
- B. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contrac
- C. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization.You recommend that if a deviation from the Architecture Contract is detected, the Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.
- D. You use the Architecture Contracts to manage the architecture governance processes for the project across the location
- E. You deploy monitoring tools to assess the performance of each completed drive assembly at each location and develop change requirements if necessary.You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local need
- F. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
- G. You create an Architecture Contract to manage and govern the implementation and migration process at each locatio
- H. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organizatio
- I. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract.You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
- J. You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk managemen
- K. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract.You schedulecompliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definitio
- L. You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
Answer: A
NEW QUESTION 6
The statement, "Getting information to the right people at the right time in a secure, reliable manner in order to support the operations that are core to the extended enterprise" describes the
concept of
- A. Boundaryless Information Flow
- B. Interoperability
- C. Portability
- D. Service Oriented Architecture
- E. Semantic Web
Answer: A
NEW QUESTION 7
Which of the following best describes an approach for adapting the ADM in the situation where business principles dictate that a packaged solution be used?
- A. Completion of the Business Architecture should follow the Information Systems Architecture
- B. Create an Architecture Vision and then a detailed Business Architecture
- C. Produce a "cut-down" version of the ADM suitable to the resources available
- D. Tailor the ADM in conjunction with another architecture framework that has deliverables specific to the vertical sector
- E. Tailor the ADM to reflect the relationships with, and dependencies on other management processes within the organization
Answer: A
NEW QUESTION 8
Complete the sentence. A gap analysis will enable the architect to do all of the following except .
- A. identify building blocks that have been inadvertently omitted
- B. identify building blocks that have been intentionally eliminated
- C. identify building blocks to be carried over
- D. identify new building blocks that are needed
- E. identify potential vendors to provide new building blocks
Answer: E
NEW QUESTION 9
According to the TOGAF standard, which of the following define general rules and guidelines for the use of resources across the enterprise?
- A. Functional Requirements
- B. Stakeholder concerns
- C. Architecture principles
- D. Business scenarios
- E. Procurement policies
Answer: C
NEW QUESTION 10
Which one of the following best describes a primary use of the Architecture Vision document?
- A. A checklist for compliance reviews
- B. An evaluation tool to select vendors to conduct a proof of concept demonstration
- C. A tool for calculating detailed cost estimates
- D. A tool for project planning the implementation activities
- E. A tool for selling the benefits of the proposed capability to stakeholders
Answer: E
NEW QUESTION 11
Which of the following does the TOGAF standard describe as an Architecture Pattern?
- A. An implementation specific solution building block
- B. A work product describing an aspect of an architecture
- C. A detailed description of the interfaces between building blocks
- D. A package of functionality defined to meet the business needs of the organization.
- E. A way to identify combinations of building blocks that have been proven to deliver solutions
Answer: E
NEW QUESTION 12
In which ADM phase is the Implementation and Migration Plan coordinated with other activities in the enterprise?
- A. Phase A
- B. Phase G
- C. Phase E
- D. Phase H
- E. Phase F
Answer: E
Explanation:
Reference https://pubs.opengroup.org/architecture/togaf91-doc/arch/chap14.html
NEW QUESTION 13
Scenario:
Please read this scenario prior to answering the Question.
The ABC company is a mobile telecommunications company formed through a series of mergers and acquisitions. They are yet to fully integrate the customer service systems for the most recent acquisitions, and as result, customer service has been a major concern for the Chief Technology Officer. Results for the last two quarters have shown that Average Revenue Per User (ARPU) and the customer retention (Churn) rate have fallen below the industry average.
The Corporate Marketing group has published some new findings about customer satisfaction. The customers appear to be switching to AirLight, a competitor, because of superior customer service. The company actually has better coverage in nearly all markets than AirLight, and good roaming agreements that keep rates low for business travelers. But, customer satisfaction has remained low. The Business Strategy group and the Enterprise Architecture group have conducted a high-level project to develop the enterprise-wide strategic plan.
They have developed a business scenario which contains a good conceptual model of what needs to be done, and also identifies the key requirements. This was used in preparing the proposal presented to the Executive Council and the Corporate Board. The planning for the program has been underway for several months. The company has selected TOGAF 9 as the basis for its Enterprise Architecture. The Corporate Board has approved funding for a multi-million Euro conversion to transition to a packaged Customer Service System. It is anticipated that the overall program will take five years to complete, but there are some tactical projects that can commence immediately to address the situation.
The Executive Council has stated that the program should define specific initiatives to enable each regional business unit to create an implementation of the Customer Service System. The implementation must meet the needs of the business unit and still provide the information needed to enable major improvements to the customer.
Refer to the Scenario
You are serving as the Lead Architect for the Performance and Integrity project of the Customer Service System program.
The project has been chartered to address the architecture(s) required to support the Customer Service System from an infrastructure perspective. At the present time, the project team is conducting an architecture development project that is focused on the customer self-service capability, which was defined as part of the earlier strategic planning activities. This capability will enable customers to access their accounts, pay bills, request account reviews, and provision services from any web-enabled device.
The project team has gathered information about the self-service capability, developed a business scenario, and used the results to define an Architecture Vision for achieving the capability.
You have been asked to recommend the course of action to complete the project. Based on TOGAF 9, which of the following is the best answer?
- A. In the remaining architecture definition phases, the project team should map out the capability in the Technology domai
- B. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that define the Target Architectur
- C. Where possible, the Solution Building Blocks should be drawn from the Architecture Repository.The completed Architecture Definition Document and the Implementation and Migration Plan will be submitted for approva
- D. Upon approval, the architecture team will conduct Compliance Assessments to ensure that the Target Architecture is properly implemented.
- E. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information Systems, and Technology domain
- F. In Phases E and F, the capability should be broken down into a set of increments that are sequenced into Transition Architectures that will lead to the realization of the Target Architecture.The resulting Solution Building Blocks will then provide the basis for the capability increment solution
- G. The completed Architecture Definition Document and the implementation end Migration Plan will be submitted for approva
- H. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conducting Compliance Assessments.
- I. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information Systems, and Technology domain
- J. In Ftiases E and F, the capability should be broken down into a set of increments that define the Target Architectur
- K. The resulting Solution Building Blocks will provide the basis for the capability increment solution
- L. The completed Architecture Definition Document and the Implementation and Migration Plan will be submitted for approva
- M. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conducting Compliance Assessments.
- N. The remaining architecture definition work should be focused on mapping out the technology and infrastructure capability in the Technology domai
- O. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that will be implemented to realize the Target Architecture.The Solution Building Blocks will provide the basis for the completed Architecture Definition Document that will be submitted for approva
- P. Upon approval, the implementation team will conduct Compliance Assessments to ensure that the self-service capability is compliant with the overall Enterprise Architecture.
Answer: D
NEW QUESTION 14
The TOGAF ADM uses version numbering to illustrate the evolution of Baseline and Target Architecture Definitions. Which version number is used to indicate a high-level outline of the architecture?
- A. Version 0.1
- B. Version 0.7
- C. Version 1.0
- D. Version 0.9
- E. Version 0.5
Answer: A
Explanation:
Reference https://pubs.opengroup.org/architecture/togaf9-doc/arch/chap04.html
NEW QUESTION 15
Which of the following is an objective of Phase G, Implementation Governance?
- A. Establish the resources for architecture governance
- B. Develop the Target Technology Architecture
- C. Ensure conformance for the target architecture
- D. Operate the governance framework
- E. Finalize the Implementation and Migration Plan
Answer: C
Explanation:
Reference
http://pubs.opengroup.org/architecture/togaf8-doc/arch/chap13.html
NEW QUESTION 16
Which of the following best describes the purpose of the Architecture Requirements Specification?
- A. It provides a list of work packages and a schedule for implementation of the target architecture.
- B. It defines the scope and approach to complete an architecture project
- C. It provides a set of statements that outline what a project must do to comply with the architecture
- D. It is sent from the sponsor and triggers the start of an architecture development cycle
- E. It contains an assessment of the current architecture requirements
Answer: C
Explanation:
Reference
http://pubs.opengroup.org/architecture/togaf91-doc/arch/chap36.html#tag_36_02_06
NEW QUESTION 17
Which section of the TOGAF template for Architecture Principles highlights the requirements for carrying out the principle?
- A. Implications
- B. Name
- C. Rationale
- D. Statement
Answer: A
NEW QUESTION 18
Which one of the following is considered a relevant architecture resource in Phase D?
- A. Generic application models relevant to the organization's industry sector
- B. Generic business models relevant to the organization's industry sector
- C. Generic data models relevant to the organization's industry sector
- D. Generic technology models relevant to the organization's industry sector
Answer: D
NEW QUESTION 19
The TOGAF ADM uses a version numbering convention to illustrate the evolution of Baseline and Target Architecture Definitions. What does Version 1.0 indicate according to this convention?
- A. A high-level outline architecture
- B. A preliminary outline architecture
- C. A formally reviewed, detailed architecture
- D. A draft, detailed architecture
- E. A formally reviewed, preliminary architecture
Answer: C
NEW QUESTION 20
According to TOGAF, in which sequence should Application Architecture and Data Architecture be developed in Phase C?
- A. Application Architecture should be developed first, then Data Architecture
- B. Application Architecture should be developed concurrently with Data Architecture
- C. Data Architecture should be developed first, then Application Architecture
- D. Application Architecture and Data Architecture may be developed in either sequence
Answer: D