Proper study guides for Down to date Cisco CGE Authorized Connected Grid Engineer Knowledge Verification certified begins with Cisco 650-127 preparation products which designed to deliver the Refined 650-127 questions by making you pass the 650-127 test at your first time. Try the free 650-127 demo right now.

P.S. Refined 650-127 training materials are available on Google Drive, GET MORE: https://drive.google.com/open?id=1rWKdNA5oegmiTbUpjUWBpanQsc-yak00


New Cisco 650-127 Exam Dumps Collection (Question 2 - Question 11)

Q2. Which of these is a grouping of elements that are part of the Cisco Substation Automation solution?

A. data center and customer call centers

B. customer call centers, electrical auto recharging, home energy management

C. protection and control, grid monitoring, multi service communications networks

A. D. multi service communications networks

E. protection and control, auto meter reading, data analysis

Answer: C


Q3. Which solution will provide remote visibility on an unattended substation?

A. unify computing

B. digital media system Cisco WebEx

C. video surveillance

D. physical access control

Answer: C


Q4. What are the two different types of console ports available? (Choose two.)

A. Network

B. USB

C. RJ45

D. Firewall

Answer: B,C


Q5. Cisco recommends that you always start to populate the Cisco CGR 2010 from which slot?

A. Slot 0

B. Slotl

C. Slot 2

D. Slot 3

Answer: A


Q6. Which one of these matches current Cisco Connected Grid solution applications?

A. Retail

B. Colocation facility

C. Branch office

D. Data Center

E. Utility substation, intelligent energy infrastructure, distributed generation, integrated renewable energy and Oil/Gas

Answer: E


Q7. What is Cisco's overall vision with respect to communications protocols?

A. To design and architect end-to-end communications infrastructure using confusing communication protocols.

B. To design and architect end-to-end communications infrastructure using foreign communication protocols.

C. To design and architect end-to-end communications infrastructure using open standard communication protocols.

D. To design and architect end-to-end communications infrastructure using proprietary communication protocols.

Answer: C


Q8. Which of the following models supports Power over Ethernet?

A. CGS-2520-24TC

B. CGS-2520-16S-8PC

C. All CGS models

D. None of the model supports POE

Answer: B


Q9. Which option is NOT one of the business drivers behind trends in the Global Energy Market?

A. Cost of doing business

B. Aging infrastructure and workforce

C. Changing Grid Architecture

D. Global warming

A. E. New Consumer Interaction Model

Answer: E


Q10. Which two data flows are used with Substation Automation with GOOSE?

A. IED RTU and IED MU

B. IED IED and IED RTU

C. IEDMU and IED IED

D. IED HMI and IED IED

Answer: A


Q11. By 2015, how big is the Smart Grid market estimated to be (Pike Research estimate}?

A. 500 Billion Dollars

B. 200 Billion Dollars

C. 400 Billion Dollars

D. 300 Billion Dollars

A. E. 100 Billion Dollars

Answer: B

Explanation: The answer to this question can be find in the Cisco Training material, module 1, second slide, available through the Partner education connection.


Recommend!! Get the Refined 650-127 dumps in VCE and PDF From Certleader, Welcome to download: https://www.certleader.com/650-127-dumps.html (New 56 Q&As Version)