NEW QUESTION 1

What is the long-term effect of reducing the number of distribution centers between a
manufacturer and its customers?

  • A. Total stock quantity increases.
  • B. Transport costs from factory to distribution centers only decrease.
  • C. Transport costs from distribution centers to customers only decrease.
  • D. Transport costs from factory to distribution centers and from distribution centers to customers decrease.

Answer: B

NEW QUESTION 2

Which of the following terms refers to a sequence of end items to produce for specific customers' orders in a make-to-order or assemble-to-order environment?

  • A. Master schedule
  • B. Final assembly schedule
  • C. Dispatch list
  • D. Input/output control

Answer: B

NEW QUESTION 3

Which of the following measures should a company focus on to reduce variation in the product?

  • A. Mode
  • B. Mean
  • C. Median
  • D. Standard deviation

Answer: D

NEW QUESTION 4

Which of the following factors is included in cost of goods sold?

  • A. Revenue
  • B. General and administrative expenses
  • C. Overhead
  • D. Standard cost

Answer: C

NEW QUESTION 5

Which of the following tools is considered to be one of the seven quality tools?

  • A. Gantt chart
  • B. Input/output chart
  • C. Control chart
  • D. Capacity chart

Answer: C

NEW QUESTION 6

When determining a make or buy decision, reasons to buy out would include:

  • A. accommodating large changes in volume.
  • B. maximizing resource utilization.
  • C. protecting confidential information.
  • D. maintaining workforce.

Answer: A

NEW QUESTION 7

Consolidating shipments and reducing the frequency of pickups help to reduce which of the following types of costs?

  • A. Warehousing and inspection
  • B. Import duties and processing
  • C. Total transportation
  • D. Capital

Answer: C

NEW QUESTION 8

A product has a forecast of 200 units a month. The actual demand for the past 6 months has been 195, 210, 205, 190, 220, and 225. Calculate the tracking signal for this product's forecast.

  • A. 6
  • B. 7.5
  • C. 45
  • D. 75

Answer: A

NEW QUESTION 9

Which of the following types of inventory is characterized by item quantity gradually being depleted then replenished?

  • A. Decoupling
  • B. Cycle
  • C. Pipeline
  • D. Anticipation

Answer: B

NEW QUESTION 10

The primary purpose of enterprise resources planning is to:

  • A. focus on the manufacturing function within an organization.
  • B. integrate an approach to business management.
  • C. use external knowledge to seek an internal advantage.
  • D. provide data protection along the supply chain.

Answer: B

NEW QUESTION 11

Which of the following manufacturing systems involves the creation of one unit or a small number of units?

  • A. Flow manufacturing
  • B. Intermittent manufacturing
  • C. Project manufacturing
  • D. Continuous manufacturing

Answer: C

NEW QUESTION 12

Which of the following statements characterizes an intermittent manufacturing environment?

  • A. Work center load is predictable.
  • B. Routings for all products are the same.
  • C. Work centers are organized by function.
  • D. Kanban is the most appropriate scheduling method.

Answer: C

NEW QUESTION 13

Which of the following techniques deals with analysis and planning of logistics and manufacturing during various time periods?

  • A. Advanced planning and scheduling
  • B. Aggregate planning
  • C. Aggregate forecast
  • D. Distribution Requirements Planning

Answer: A

NEW QUESTION 14

Which of the following typically would be the most economical mode of transportation for crude oil to an oil refinery?

  • A. Water
  • B. Pipeline
  • C. Truck
  • D. Rail

Answer: B

NEW QUESTION 15

Having the needed materials within easy reach of a subassembly process eliminates waste of:

  • A. motion.
  • B. transportation.
  • C. making defects.
  • D. stocks.

Answer: A

NEW QUESTION 16

Which of the following statements best describes an example of advance ship notice?

  • A. An electronic data interchange communication indicating that an order has left the port of loading
  • B. A person who handles international shipping documentation and transportation requirements
  • C. A fee for material held at port longer than the standard unloading time
  • D. A listing of the items included in an overseas shipment

Answer: A

NEW QUESTION 17

Which of the following documents or records typically is required by accounting, receiving, purchasing, and the supplier?

  • A. Bill of lading
  • B. Purchase requisition
  • C. Receiving report
  • D. Purchase order

Answer: D

NEW QUESTION 18

Which of the following types of layouts is most efficient in a lean production environment?

  • A. Islands
  • B. Connected islands
  • C. Functional layout
  • D. Cells

Answer: D

NEW QUESTION 19

Which of the following differences must be taken into consideration when dealing with a global distribution system?

  • A. Culture
  • B. Cost
  • C. Carriers
  • D. Computer systems

Answer: A

NEW QUESTION 20

Manufacturing overhead includes which of the following types of costs?

  • A. Interest expense
  • B. Supervision
  • C. Direct labor
  • D. Direct material

Answer: B

NEW QUESTION 21

The complete supply chain dedicated to the flow of products for returns, repair and remanufacturing is:

  • A. reverse auction.
  • B. reverse engineering.
  • C. reverse flow scheduling.
  • D. reverse logistics.

Answer: D

NEW QUESTION 22

Which of the following is a graphical representation of a frequency distribution?

  • A. Cause-and-effect diagram
  • B. Pareto analysis
  • C. Scatter diagram
  • D. Histogram

Answer: D

NEW QUESTION 23

An appropriate reason to carry safety stock is to protect against:

  • A. demand fluctuations before the order point is reached.
  • B. demand fluctuations after the order point is reached.
  • C. price fluctuations before the order point is reached.
  • D. price fluctuations after the order point is reached.

Answer: B

NEW QUESTION 24

Production activity control receives authorization to release work orders from:

  • A. the material requirements plan.
  • B. the master production schedule.
  • C. production planning.
  • D. input/output control.

Answer: A

NEW QUESTION 25

Characteristics that cause customers to consider a company's products or services are called:

  • A. order qualifiers.
  • B. order winners.
  • C. product configurations.
  • D. product specifications.

Answer: A

NEW QUESTION 26
......

Recommend!! Get the Full CPIM-BSP dumps in VCE and PDF From Thedumpscentre.com, Welcome to Download: https://www.thedumpscentre.com/CPIM-BSP-dumps/ (New 155 Q&As Version)