Your success in VMware 3V0-42.20 is our sole target and we develop all our 3V0-42.20 braindumps in a way that facilitates the attainment of this target. Not only is our 3V0-42.20 study material the best you can find, it is also the most detailed and the most updated. 3V0-42.20 Practice Exams for VMware 3V0-42.20 are written to the highest standards of technical accuracy.

Online 3V0-42.20 free questions and answers of New Version:

NEW QUESTION 1
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution. This information was gathered during the Assessment Phase:
3V0-42.20 dumps exhibit There is a performance based SLA for East ?C West traffic.
3V0-42.20 dumps exhibit The business critical applications require prioritization of their traffic.
3V0-42.20 dumps exhibit One of the services is a file share and has a high demand for bandwidth.
Which selection should the architect include in their design? (Choose the best answer.)

  • A. Review average North/South traffic from the core switches and firewall.
  • B. Include a segment QoS profile and review the impact of utilizing this feature.
  • C. Meet with the organization??s application team to get additional information.
  • D. Monitor East-West traffic throughout normal business cycles.

Answer: B

NEW QUESTION 2
What selection is the key design benefit provided by a dedicated Edge Cluster VM or Bare Metal? (Choose the best answer.)

  • A. reduced administrative overhead
  • B. predictable network performance
  • C. multiple Tier-0 gateways per Edge Node Cluster
  • D. support for Edge Node Clusters with more than 10 Edge Nodes

Answer: B

NEW QUESTION 3
An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution. This information was gathered by the architect during the Discover Task of the Engagement Lifecycle:
3V0-42.20 dumps exhibit Existing hardware will be used in any design proposal.
3V0-42.20 dumps exhibit Network bandwidth cannot be expanded.
Which concept of the Discover Task do these items belong to? (Choose the best answer.)

  • A. constraint
  • B. requirement
  • C. risk
  • D. assumption

Answer: A

NEW QUESTION 4
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution. Which two statements should the architect consider as non-technical requirements? (Choose two.)

  • A. Any solution should add more value to current and future customers engagements.
  • B. The design should offer agility and freedom for application phases.
  • C. All application servers have hardcoded IP addresses.
  • D. Current business continuity and disaster recovery plans are based on tape technology.
  • E. Different vendors are used for the storage solution.

Answer: BD

NEW QUESTION 5
Which three IPv6 features are supported in an NSX-T Data Center design? (Choose three.)

  • A. IPv6 OSPF
  • B. IPv6 static routing
  • C. IPv6 switch security
  • D. IPv6 DNS
  • E. IPv6 Distributed Firewall
  • F. IPv6 VXLAN

Answer: BCE

NEW QUESTION 6
An architect is helping an organization with the Physical Design of an NSX-T Data Center solution. This information was gathered during a workshop:
3V0-42.20 dumps exhibit Any proposed solution must provide low latency.
3V0-42.20 dumps exhibit Any proposed solution must provide high throughput.
3V0-42.20 dumps exhibit Customer is running stock trading applications.
Which two selections should the architect recommend to meet high-performance workload requirements?
(Choose two.)

  • A. Leverage ESXi as the compute host.
  • B. Use LACP for all uplink profiles.
  • C. Leverage KVM as the compute host.
  • D. Enable enhanced data path mode on the N-VDS.
  • E. Enable latency sensitivity mode on the N-VDS.

Answer: AD

NEW QUESTION 7
An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution. This information was gathered by the architect during the Discover Task of the Engagement Lifecycle:
3V0-42.20 dumps exhibit There are applications which use IPv6 addressing.
3V0-42.20 dumps exhibit Network administrators are not familiar with NSX-T Data Center solutions.
3V0-42.20 dumps exhibit Hosts can only be configured with two physical NICs.
3V0-42.20 dumps exhibit There is an existing management cluster to deploy the NSX-T components.
3V0-42.20 dumps exhibit Dynamic routing should be configured between the physical and virtual network.
3V0-42.20 dumps exhibit There is a storage array available to deploy NSX-T components.
Which two requirements were documented by the architect? (Choose two.)

  • A. There are applications which use IPv6 addressing.
  • B. Dynamic routing should be configured between the physical and virtual network.
  • C. Hosts can only be configured with two physical NICs.
  • D. The storage array has enough capacity to deploy NSX components.
  • E. Network administrators are not familiar with NSX-T Data Center solutions.

Answer: BD

NEW QUESTION 8
A customer deploying NSX-T Data Center requires role based access controls be enforced in NSX Manager with these requirements:
3V0-42.20 dumps exhibit identity platform must be highly available
3V0-42.20 dumps exhibit authentication must be performed by customer??s existing SAML identity provider
3V0-42.20 dumps exhibit MFA must be performed by administrator to gain access to NSX Manager
Which identity deployments would meet the customer??s requirements? (Choose the best answer.)

  • A. NSX Manager OAuth 2.0 registered to a 3-node Active Directory Federation Services cluster.
  • B. NSX Manager OAuth 2.0 registered to a 2-node VMware Identity Manager cluster.
  • C. NSX Manager OAuth 2.0 registered to a 2-node Active Directory Federation Services cluster
  • D. NSX Manager OAuth 2.0 registered to a 3-node VMware Identity Manager cluster.

Answer: D

NEW QUESTION 9
An administrator is asked to improve Recovery Point Objective (RPO) and Recovery Time Objective (RTO) for Disaster Recovery (DR) in their company network. The network has a primary site and a secondary site. The ability to support outages with minimum loss of connectivity to the company??s core application is a priority.
Which design should the administrator recommend? (Choose the best answer.)

  • A. NSX-T Data Center using an Orchestrator to recover VMs across sites.
  • B. NSX-T Data Center using Federation and dependencies set between primary and secondary sites.
  • C. NSX-T Data Center using a registered third-party DR solution.
  • D. NSX-T Data Center using built-in standard automation DR and secondary site recovery setup.

Answer: B

NEW QUESTION 10
An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution. Which risk is documented by an architect? (Choose the best answer.)

  • A. The security team has a firewall communication matrix documented.
  • B. The team is not trained for NSX-T but have a very strong experience with vSphere.
  • C. Open communication between different application tiers is not allowed.
  • D. Aggregate N-S throughput at any given time should be at least 10G.

Answer: B

NEW QUESTION 11
Refer to the exhibits.
Design Option1:
3V0-42.20 dumps exhibit
Design Option 2:
3V0-42.20 dumps exhibit
Design Option 3:
3V0-42.20 dumps exhibit
Design Option 4:
3V0-42.20 dumps exhibit
An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution. The conceptual design includes these requirements, assumptions, constraints, and risks:
3V0-42.20 dumps exhibit Critical applications must run across sites without changing IP address.
3V0-42.20 dumps exhibitRTO/RPO must be reduced for recovery of applications on secondary site.
3V0-42.20 dumps exhibit IT Teams require automation tools for configuration.
Which Conceptual Design would the architect recommend to the customer? (Choose the best answer.)

  • A. Design Option 4
  • B. Design Option 2
  • C. Design Option 1
  • D. Design Option 3

Answer: C

NEW QUESTION 12
A customer has a requirement to implement a next generation firewall (NGFW) to improve security network introspection. The customer wants to apply the NGFW to all workloads exposed both internally and externally. The customer wants the NGFW to work seamlessly with NSX-T Data Center and vSphere.
Which solution should be recommended to the customer? (Choose the best answer.)

  • A. Use network introspection only on the external workloads and use NSX DFW for internal workloads.
  • B. Apply the NGFW on bare metal hosts which will offer better performance of inline network introspection.
  • C. Apply the NGFW to internal and external workloads for increased protection and use NSX-T Data Center with Federation to set network policies.
  • D. Use NSX-T Data Center leveraged with NSX Intelligence to protect all workloads at the network inspection level.

Answer: D

NEW QUESTION 13
According to the Discover Task of the Engagement Lifecycle, which statement would be classified as a risk? (Choose the best answer.)

  • A. Enough power and cooling capacity is available in each rack in the data center.
  • B. To retain certification to provide financial services to end customers, PCI-DSS audits need to be passed.
  • C. A merger and acquisition process was recently completed and new company on-boarding is not completed.
  • D. Due to existing contracts and purchase agreements, the existing server hardware needs to be reused.

Answer: B

NEW QUESTION 14
What is a design justification for a solution with 3 NSX Manager nodes deployed in a 4 ESXi cluster Management Cluster? (Choose the best answer.)

  • A. NSX Controllers are separated from NSX Managers allowing 6 ESXi servers to host them.
  • B. NSX Management Plane and Control Plane will be reduced to a single point of failure.
  • C. Compute consumption guarantees NSX Manager nodes can be run on the same ESXi host.
  • D. Single point of failure on Control Plane and Management Plane will be mitigated.

Answer: B

NEW QUESTION 15
A Solutions Architect is designing an environment with 1,200 services being offered through the NSX-T Data Center Load Balancer.
Which three selections are necessary to meet the minimum requirements to support the solution? (Choose three.)

  • A. Extra Large Load Balancer
  • B. Tier 1 Gateway
  • C. Tier 0 Gateway
  • D. Large Edge Node
  • E. Extra Large Edge Node
  • F. Large Load Balancer

Answer: BDF

NEW QUESTION 16
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution. This information was gathered during the Assessment Phase:
3V0-42.20 dumps exhibit Maximum performance and availability is required between the physical and virtual network.
3V0-42.20 dumps exhibit Load Balancing service is required for back-end web servers.
3V0-42.20 dumps exhibit NAT is required.
Which selection should the architect include in their design? (Choose the best answer.)

  • A. Deploy a Tier-1 gateway and connect it to an Active/Active Tier-0 gateway with ECMP configured.
  • B. Deploy an Active/Active Tier-0 gateway and configure ECMP.
  • C. Deploy an Active/Standby Tier-0 gateway and configure ECMP.
  • D. Create two separate VLANs to connect the Tier-0 gateway upstream traffic and configure ECMP.

Answer: C

NEW QUESTION 17
Which three assessment findings are part of a Conceptual Design? (Choose three.)

  • A. risks
  • B. host names
  • C. justifications
  • D. constraints
  • E. assumptions
  • F. vendor model

Answer: ACD

NEW QUESTION 18
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution. This information was gathered during the assessment:
3V0-42.20 dumps exhibit There must be a performance based SLA for East ?C West traffic.
Which two key performance features should the architect recommend? (Choose two.)

  • A. Configure N-VDS enhanced Data Path
  • B. Install advanced Edge pNIC Features
  • C. Setup RSS to leverage multiple cores
  • D. Leverage DPDK drivers
  • E. Enable GENEVE Offload

Answer: CE

NEW QUESTION 19
An NSX-T Architect is working in a brownfield environment with 4 ESXi hosts. These constraints were documented:
3V0-42.20 dumps exhibit new servers cannot be purchased
3V0-42.20 dumps exhibit North/South bandwidth must be guaranteed
3V0-42.20 dumps exhibit Top-of-Rack switches have additional uplinks
Which three recommendations should the architect implement? (Choose three.)

  • A. Remove one of the ESXi hosts and install a bare-metal Edge.
  • B. Use a resource pool for production workloads.
  • C. Use a resource pool to deploy the Edge nodes on.
  • D. Recommend obtaining 2 new physical NICs for the servers.
  • E. Install Edge nodes on a separate cluster.

Answer: ACD

NEW QUESTION 20
Which two protocols are typically used for multicast in a NSX-T Data Center environment? (Choose two.)

  • A. PIM Full Form
  • B. PIM Dense Mode
  • C. IGMPv2
  • D. PIM Sparse mode
  • E. IGMPv3

Answer: CD