C2010-825 Exam Questions - Online Test


C2010-825 Premium VCE File

Learn More 100% Pass Guarantee - Dumps Verified - Instant Download
150 Lectures, 20 Hours

certleader.com

It is impossible to pass IBM C2010-825 exam without any help in the short term. Come to Pass4sure soon and find the most advanced, correct and guaranteed IBM C2010-825 practice questions. You will get a surprising result by our Renovate IBM Certified Solutions Specialist - Rational Team Concert V6 practice guides.

Free C2010-825 Demo Online For IBM Certifitcation:

NEW QUESTION 1
What is the source of the data to create metric based reports?

  • A. RTC REST API
  • B. CCM Database
  • C. Data Warehouse
  • D. Data Collection Component Database

Answer: B

NEW QUESTION 2
A user needs to import work items into a project area using the RTC Eclipse client. Which file content type can be used?

  • A. XML document
  • B. Rich Text document
  • C. File Interchange format
  • D. Comma Separated Value

Answer: C

NEW QUESTION 3
Management is asking for report describing all RTC users, team areas, team members and corresponding process roles, as well as team area administrators for an RTC project area.
How should the report be created?

  • A. Generate Runtime Report using the RTC Eclipse client.
  • B. Use the "repotools-jts" utility with the "exportUsers" option.
  • C. Export users from the Team Organization View in the RTC Eclipse client.
  • D. Export the users from the "Active Users" menu on the JTS Application Administration Web Pag

Answer: D

NEW QUESTION 4
An RTC administrator has installed JTS and CCM using a departmental server topology and completed the Jazz Team Server and Application Setup process.
How many Public URIs (context root) exist for this topology?

  • A. Zero
  • B. 1 for JTS
  • C. 1 for CCM
  • D. 1 for JTS and 1 for CCM

Answer: C

NEW QUESTION 5
A developer is working on source code changes and would like to test them using an existing build definition. The developer, however, does not want the testing to impact the overall build definition status or notify subscribers. How can this be accomplished?

  • A. Request a personal build.
  • B. Restart the build engine in test mode.
  • C. Set the build result's type to Private.
  • D. Define a pruning policy on the build definitio

Answer: A

NEW QUESTION 6
A scrum master wants to determine if the team has enough time to complete the work planned for an iteration. What is used to assess this?

  • A. Plan's Task Board View
  • B. Ranked List of work items
  • C. Load Bar in the Plan Details
  • D. Traceability View sorted by Estimate

Answer: B

NEW QUESTION 7
A development has organized the source code into components and found that there is a strong dependency or containment relationship between two of the components.
What action could the development team take to establish this relationship?

  • A. Take a baseline of both components.
  • B. Update both component's Properties view.
  • C. Utilize a work item to link both components.
  • D. Create the Child component as a subcomponent of the paren

Answer: B

NEW QUESTION 8
An administrator would like to prevent source code check-ins without a review and has added the Code Review Summary to the work item editor presentation.
What additional step must be taken?

  • A. create Prevent Check-ins rule
  • B. create Approval Template
  • C. add appropriate preconditions
  • D. add Approval state to workflow

Answer: B

NEW QUESTION 9
A project manager wants to create an effective project dashboard and is planning the content. Which points should be considered? (Choose three.)

  • A. Determine the goals for the dashboard.
  • B. Consider creating a project plan dashboard.
  • C. Determine how the dashboard addresses the goals.
  • D. Consider the layout and number of columns for the dashboard.
  • E. Determine whether to use a personal, project or team dashboard.
  • F. Choose reports to add to the dashboard that will display the appropriate metric

Answer: BEF

NEW QUESTION 10
A developer working in the RTC Eclipse client has changed several files in the loaded workspace and checked them in. The developer then suspends the changes.
What is the result?

  • A. The change set is discarded and the changes permanently removed.
  • B. The change set is removed from the workspace, but preserved in the repository.
  • C. The change set remains in the Outgoing folder but must be reactivated in order to work with it.
  • D. The change set is marked as complete and then flows to the current flow target of the workspac

Answer: C

NEW QUESTION 11
A project manager determines the current iteration is complete and decides that the next iteration should be started. How is this done?

  • A. Set the current iteration's status to complete.
  • B. Set the next iteration as the current iteration.
  • C. Specify that a release is scheduled with the next iteration
  • D. The start and end dates will automatically start the next iteration.

Answer: B

NEW QUESTION 12
Which RTC client allows a user to lock and download a source file in a single operation?

  • A. Web client
  • B. Eclipse client
  • C. Explorer Shell
  • D. ClearCase bridge

Answer: A

NEW QUESTION 13
A user wants a query to filter work items in the closed group of a workflow. Which option in the query condition allows this?

  • A. Resolved
  • B. Unassigned
  • C. Unresolved
  • D. Current Iteration

Answer: C

NEW QUESTION 14
A development team is using the RTC web interface to update plans and work items. One user notices that recent work item changes are not rendered in the web browser.
What is the reason for this?

  • A. The web browser is caching the work items.
  • B. The data warehouse has not yet been updated.
  • C. The web browser version is no longer supported.
  • D. User does not have permission to view the work ite

Answer: A

NEW QUESTION 15
A user wants to create an enumeration. There is a requirement to allow users with the appropriate permissions to add new literals from the Work Item editor.
Where does the enumeration need to be stored?

  • A. Database
  • B. Process Template
  • C. Repository Workspace
  • D. Process Specification

Answer: A

NEW QUESTION 16
An administrator wants to make sure that time remaining on work items in a plan view are consistent with the estimate. Which plan check ensures this?

  • A. Invalid Estimate Check
  • B. Planning Problems Check
  • C. Traditional Planning Check
  • D. Cross-Project Planning Problems Check

Answer: B

NEW QUESTION 17
A user loaded a repository workspace that flows with the team's stream. The user can see an incoming change for the file CoreClass in the RTC client, but decides to edit this file and check in the change.
How does the Jazz SCM handle this situation?

  • A. A potential conflict is detected and the user is prevented from checking in the file CoreClass that already has an incoming change.
  • B. The conflict for the file CoreClass is detected in the incoming and outgoing change sets and the changes are automatically merged for the user.
  • C. A conflict between the incoming and outgoing change sets for the file CoreClass is detected and the conflict is shown in the pending changes view.
  • D. The incoming changes for the file CoreClass are detected and the file is automatically set to read-only, preventing the user from accidentally editing it.

Answer: D

NEW QUESTION 18
A scrum master has defined an iteration plan and created several tasks for the plan. The assigned team members are updating the tasks' attributes of Status, Estimate Correction and Time Remaining in the work item editors.
How do these updates affect the plan's Work Breakdown view?

  • A. The progress bars for each team member reflect the changes.
  • B. The view shows work items organized into columns based on status.
  • C. The tasks' ranks are updated automatically to reflect the updated attributes.
  • D. They don't; the tasks must be modified in the plan editor to affect the pla

Answer: A

NEW QUESTION 19
A user wants to add widgets from external sources to a RTC Dashboard. Which type can be added?

  • A. Apache Widget
  • B. Open Social Gadget
  • C. Google Open Gadget
  • D. External Content Widget

Answer: A

NEW QUESTION 20
A developer has been assigned the following roles, in order, for the project area:
• Team Member
• Stakeholder
and the following roles, in order, for the team area:
1. Release Engineer
2. Developer
Deliver preconditions have been configured for the team area.
Which role is considered first during the deliver operation to a stream owned by the team area?

  • A. Developer
  • B. Stakeholder
  • C. Team Member
  • D. Release Engineer

Answer: B

NEW QUESTION 21
A user needs to export the results from a work item query in the RTC Eclipse client. Which of the below file formats can be used?

  • A. XML file
  • B. PDF document
  • C. Word document
  • D. Spreadsheet format (CSV)

Answer: C

NEW QUESTION 22
Which build artifact allows developers to associate the outcome with a release?

  • A. Build Result
  • B. Build Script
  • C. Build Engine
  • D. Build Definition

Answer: B

NEW QUESTION 23
......

Recommend!! Get the Full C2010-825 dumps in VCE and PDF From Downloadfreepdf.net, Welcome to Download: https://www.downloadfreepdf.net/C2010-825-pdf-download.html (New 60 Q&As Version)